FD1/2 Activity / Mother plant system

Faltec Dash 1/2 activity (FD1/2 activity)

 FALTEC is working on activity which is halving space and lead time globally.
Through this activity, we will be thorough to reduce cost and aim for industry top level of cost competitiveness. 6 themes activities centering on FD1/2 Monozukuri cost reduction activity have been started as second stage of Faltec Dash 1/2 activity for reducing variable cost.

 

FD1/2 activity Second stage

  ① FD1/2 Monozukuri cost reduction activity (most important activity)
      ・Manpower saving (Multi forming machine handling, Automatization assembly line)
      ・New method / technology establishment
  ② Indirect operation streamlining activity
  ③ Global physical distribution cost reduction activity
  ④ Energy cost reduction activity
  ⑤ Plant space halving activity
  ⑥ Stock reduction activity

Promoting mother plant system

 Same facility, Same process, Same quality, Same improvement, Same management
Monozukuri and technical standards are deployed by Kita-Kanto plant (Tatebayashi/Fukushima) for all manufacturing sites.

【Implenetation items】


 